Quantcast

GE Aerospace aims for year-end FAA approval for Catalyst turboprop engine

GE Aerospace aims for year-end FAA approval for Catalyst turboprop engine
Policy
Webp 4icawwvtg7mupp051grumj0ndq6y
JSX Aircraft | Official Website

GE Aerospace’s Catalyst turboprop engine is meeting and exceeding its targeted performance numbers and is on track for FAA certification by year-end, the company announced this week at EAA AirVenture 2024. The engine powers Textron Aviation’s Beechcraft Denali single-engine turboprop, which is set for certification next year. Both are on display at AirVenture, marking the first time the GE display is hosting the actual engine instead of a mockup.

Engines in the flight-test program have logged more than 2,100 hours and 900 flights, which “gives a lot of confidence in the performance,” noted Paul Corkery, head of GE's Catalyst program. Compared to other 1,300-shp powerplants, he said the GE engine burns 18% less fuel while producing 10% more power at altitude.

Catalyst's Fadec engine controls, adapted from systems on larger GE turbine engines, are integrated with the Denali’s Garmin G3000 avionics and autothrottle. This integration enables Textron Aviation engineers to design a single-lever power control that simplifies pilot workload and protects the engine from exceeding critical parameters.

Get the Newsletter
Sign-up to receive weekly round up of news from Sky Industry News
By submitting, you agree to our Privacy Policy and Terms of Service. By providing your phone number you are opting in and consenting to receive recurring SMS/MMS messages, including automated texts, to that number from our short code. Msg & data rates may apply. Reply HELP for help, STOP to end. SMS opt-in will not be sold, rented, or shared.

The $6.95 million Denali first flew on Nov. 21, 2021. While certification was initially planned for 2023, delays in the Catalyst program pushed that timeline to 2025. According to Corkery: “We faced tough new regulations that were more challenging than expected.” These regulations pertained to ice crystal and super-cooled liquid droplet mitigation. “We had to bring in very experienced folks to get those [requirements] over the line,” he added. “Those were big headwinds. But we feel we’ve mitigated the risk to get certification by the end of the year.”

For FAA certification, the Catalyst had to complete 23 key engine-level tests; 19 of these tests have been completed so far. The remaining four—covering endurance, vibration, blade-out, and compressor operability—are currently underway in four separate test cells. “We expect all that testing to be wrapped up by the end of the third quarter,” Corkery stated, “then we’ll be finalizing and submitting the final reports.”

Meanwhile, GE is establishing its service infrastructure to support Catalyst once Denali begins shipping. The production readiness phase is also underway with GE having already built 35 engines. “We’ll deliver what Textron Aviation needs,” Corkery said. “We’re aligned with their schedule.”

Organizations Included in this History
More News

Alaska Airlines has announced a significant expansion of its route network for 2026, with plans to introduce service to two new cities and launch 13 new or returning routes.

Oct 25, 2025

Delta Air Lines will introduce new in-flight menu options created by celebrity chef José Andrés starting November 4.

Oct 25, 2025

The Blue Sky partnership between United Airlines and JetBlue launched today, allowing members of both airlines’ loyalty programs to earn and redeem points across the two carriers.

Oct 25, 2025

Air Canada is set to expand its presence at Billy Bishop Toronto City Airport (YTZ) by introducing four new nonstop routes to the United States in 2026.

Oct 25, 2025

United Airlines has announced it will add 10 new destinations from its Chicago O'Hare International Airport hub starting next year.

Oct 25, 2025

The partnership between United Airlines and JetBlue, known as Blue Sky, has officially launched.

Oct 25, 2025