Quantcast

Boeing addresses thrust link issue delaying 777X program

Boeing addresses thrust link issue delaying 777X program
Policy
Webp b777 3
Boeing 777X | Boeing

Boeing has made significant progress in addressing a critical issue with its 777X aircraft, which faced delays due to a thrust link problem discovered in 2024. This problem was identified as a fault in the forward engine-to-strut bolt of the GE9X engines, leading to the grounding of test flights and suspension of engine certification activities. Boeing's resolution involved strengthening the forward engine attach bolt and modifying the surrounding pylon structure.

The issue posed an unacceptable risk under specific flight conditions, affecting all four test aircraft and coinciding with heightened scrutiny from the FAA. Boeing collaborated closely with GE Aerospace to ensure that the fix did not require a major redesign and maintained alignment and stress tolerances.

By December 2024, redesigned components were integrated into the test fleet, followed by rigorous testing in January 2025. "According to Reuters, in mid-January 2025, Boeing resumed flight testing of the 777X after receiving FAA approval for its thrust link modifications." The first post-grounding flight focused on validating the new engine attachment system under various load scenarios.

Get the Newsletter
Sign-up to receive weekly round up of news from Sky Industry News
By submitting, you agree to our Privacy Policy and Terms of Service. By providing your phone number you are opting in and consenting to receive recurring SMS/MMS messages, including automated texts, to that number from our short code. Msg & data rates may apply. Reply HELP for help, STOP to end. SMS opt-in will not be sold, rented, or shared.

Airlines such as Emirates, Lufthansa, and Qatar Airways have been monitoring developments closely. With deliveries delayed beyond their original target dates, confidence is returning now that testing has resumed. According to Gulf Business, Emirates President Tim Clark expressed approval of Boeing’s transparency during this process.

The Boeing 777X program is now on track for certification by late 2025 or early 2026. Analysts believe that despite delays, the aircraft's fuel efficiency and capacity remain compelling for long-haul carriers. The resolution of this setback reinforces Boeing’s credibility amid customer trust challenges.

As Boeing moves forward with future aircraft development, lessons learned from this incident will likely influence design and testing processes for upcoming models like the New Midsize Airplane (NMA). The company aims to balance innovation with validation as it works towards restoring leadership in widebody aircraft production.

Organizations Included in this History
More News

UPS has operated one of the longest direct air cargo routes in the United States since 2018, connecting Louisville’s Muhammad Ali International Airport (SDF) in Kentucky with Dubai International Airport (DXB) in the United Arab Emirates.

Aug 2, 2025

The Boeing 737 MAX 10 is the largest version of the 737 family, designed to compete with the Airbus A321neo.

Aug 2, 2025

Russian airline Aeroflot reported significant flight disruptions on Monday, July 28, due to a failure in its information systems.

Aug 2, 2025

After more than four years, American Airlines will reintroduce its Boeing 777-200ER aircraft on the New York John F. Kennedy International Airport (JFK) to Los Angeles International Airport (LAX) route starting October 6.

Aug 2, 2025

The Airbus A321XLR, which entered service in late 2024, is now the longest-range narrowbody aircraft available.

Aug 2, 2025

The Boeing 747 and Airbus A380 are the only commercial jetliners with a partial or full second passenger deck, and both have left a significant mark on aviation history.

Aug 2, 2025