Quantcast

Minneapolis-St. Paul airport schedules runway improvements for 2025

Minneapolis-St. Paul airport schedules runway improvements for 2025
Policy
Webp received 522832477360106
Roy Fuhrmann Chief Operating Officer of MAC | Metropolitan Airports Commission

Minneapolis–St. Paul International Airport will commence safety and airfield improvement projects on Runway 12R-30L in two distinct phases throughout 2025. The Metropolitan Airports Commission (MAC), which manages the airport operations, has laid out the timeline for these essential upgrades.

According to the MAC, the first phase of construction will begin on April 14 and conclude on May 23. The second phase is scheduled from August 18 to September 26. The runway targeted for improvement is the east-west parallel runway located south of Terminal 1. The schedule was intentionally designed to keep the runway operational during the peak summer months, minimizing disruptions.

Roy Fuhrmann, COO of the MAC, stated, "The improvements are essential to maintain runway safety and extend the efficiency of our operations in the long term. With this closure, air traffic control can assign flights to any of MSP’s three other runways depending on wind direction, air traffic demand, or other operational factors."

Get the Newsletter
Sign-up to receive weekly round up of news from Sky Industry News
By submitting, you agree to our Privacy Policy and Terms of Service. By providing your phone number you are opting in and consenting to receive recurring SMS/MMS messages, including automated texts, to that number from our short code. Msg & data rates may apply. Reply HELP for help, STOP to end. SMS opt-in will not be sold, rented, or shared.

These improvements include safety area grading of Runway 12R-30L, drainage and shoulder enhancements, and the reconstruction of Taxiway D near Taxiway W. The designated runway safety area is intended to mitigate risks in cases of inadvertent aircraft departures from the runway. It must be devoid of debris, adequately graded, and supportive of aircraft and emergency vehicles.

During the closure, the airport will adjust its operations to accommodate ongoing air traffic. The air traffic control (ATC) will assess various factors such as wind and operational efficiency while utilizing the priority Runway Use System (RUS) to direct flights over less populated residential zones where possible, reducing noise disruption.

As the work progresses, residents near the airport might witness altered flight patterns and a possible increase in aircraft activity, contingent on daily operational needs. Once construction concludes, all operations are expected to return to normal.

The airport has seen upgrades in phases over recent years, including the temporary closures of other runways for safety refurbishments. These efforts are part of a broader maintenance strategy essential for ensuring ongoing safe operations at such a key infrastructure hub.

Organizations Included in this History
More News

Flying Food Group has highlighted the importance of its Corporate Treasury Team in managing financial resources.

Jul 26, 2025

Etihad Airways is preparing to launch its new Airbus A321LR aircraft, which promises to enhance the narrow-body flying experience.

Jul 26, 2025

Eurowings has been recognized as one of the top airlines in Europe, according to a study by the consumer portal Flightright.

Jul 25, 2025

American Airlines is set to reintroduce its Boeing 777-200ER aircraft for domestic flights between New York's John F. Kennedy International Airport (JFK) and Los Angeles International Airport (LAX) this fall.

Jul 25, 2025

Southwest Airlines is in the process of introducing extra-legroom seats across its fleet, with about 25% of its planes now featuring these new rows.

Jul 25, 2025

The Ethiopian Airlines Group recently marked a significant milestone with the inauguration of its expanded Maintenance, Repair, and Overhaul (MRO) facilities.

Jul 25, 2025